St.martin Guest House 2017 AND NEW SOLAR IRRIGATION PROJECT 2017 ACHIEVEMENTS.

St.martin Guest house 2017

 

Levelling with use of BackhoeLevelling with use of Backhoe

 

 

 

 

 

 

 

Preparing the field Preparing the field

 

 

 

 

 

 

 

 

Digging 300m long ditchDigging 300m long ditch

 

 

 

 

 

 

 

Construction of tank elevationConstruction of tank elevation

 

 

 

 

 

 

 

 

Excavating pit for submersible pumps

Excavating pit for submersible pumps

 

 

 

 

 

 

 

 

DSCN4004

3×10,000Ltrs water tank

 

 

 

 

 

 

 

 

Unloading solarkit itemsUnloading solarkit items

 

 

 

 

 

 

 

 

Solar pumps

Solar Pumps

 

 

 

 

 

 

 

 

Solar pumps installed

.Solar pumps installed

 

 

 

 

 

 

 

 

Control Panel                                Control panel

 

 

 

 

 

 

 

 

Securing pumpsSecuring Pumps

 

 

 

 

 

 

 

 

Installing water lines

Installing water lines

 

 

 

 

 

 

 

 

DSCN3887

Tomatoes

 

 

 

 

 

 

 

 

GREEN GRAMS READY FOR MIST IRRIGATION

Green grams Ready for mist irrigation

 

 

 

 

 

 

 

 

Mist irrigation working

Mist Irrigation working

 

 

 

 

 

 

 

 

DSCN4007Ready watermelon from our project

 

 

 

 

 

 

 

 

DSCN3982Butternut first product of mist irrigation

 

 

 

 

 

 

 

 

DSCN4005

Butternut and Watermelon taken to the market

 

 

 

 

 

 

 

 

DSCN4018Loading tomatoes in the boat

 

 

 

 

 

 

 

 

DSCN4021

Transportation of tomatoes  to the market.

This entry was posted in News and Projects, St. Martin Youth Training Centre. Bookmark the permalink.

Comments are closed.